TerexParts Pro Builds With Less Diesel, Less Dust and Longer Component Life

Reliable lifting equipment can also lower waste. Our sustainability work focuses on practical crane rebuild life, Tier 4 Final service behavior, dust-aware site routines and restoration commitments contractors can verify.

Restored quarry with crane and service team

We commit to halving scope-1 and scope-2 emissions per documented crane service hour by 2030, audited annually and tied to measurable rebuild, idle-reduction and parts logistics programs.

Diesel Down 50%

Service trucks, field generators and crane support routines are measured against a 2020 baseline. The program emphasizes planned dispatch, lower idle time, route consolidation and operator training that reduces unnecessary regeneration events.

Dust Down 70%

For quarry and demolition support, TerexParts Pro pairs crane service with dust-suppression bowsers, sealed parts handling, cleaner hydraulic repairs and site practices that lower airborne material during component swaps.

Rebuild Life Extended

Every remanufactured hoist, cylinder, slew bearing or control assembly keeps embodied steel and machining value in use. We document rebuild hours so contractors can defend the choice against one-way replacement.

2030 tracker

Progress We Can Explain to Project Owners

78% of 100%78% / 100%
14% of 60%14% / 60%
62% of 100%62% / 100%
82% complete0.18 target path
ISO 14001ISO 50001CDP Supplier ResponseSBTi 1.5°C PathResponsible Steel UseQuarry Restoration Review

Request the 2030 Construction Sustainability Roadmap

We will send the current 32-page roadmap and explain which metrics apply to your crane fleet, quarry shutdown plan or bridge lifting package.