Crane uptime partner

TerexParts Pro Crane Support for Lift-Critical Construction Sites

Tower crane, crawler crane and rough-terrain crane owners use TerexParts Pro when parts availability, load-chart discipline and field response have to meet the same project schedule.

  • Parts 22 regional hubs with serial-number verification
  • Service < 18h MTTR target on contracted lift sites
  • Compliance AS 2550, CE 2006/42/EC and Tier 4 Final support
Crawler crane lifting steel beam on urban construction site
35,000+Machines supported worldwide
60+Countries with active site coverage
22Regional parts and rebuild hubs
8,000hStructured component overhaul cycle
Field-proven history

From Lift Parts Desk to Global Crane Service Network

  1. 1996

    First crawler crane parts desk opens

    Started with slew rings, boom chord sections and hydraulic seals for regional bridge contractors.

  2. 2003

    Quarry and precast support added

    Service teams began staging crane spares beside aggregate belts and segment yards before planned lifts.

  3. 2010

    Tier 4 Final records embedded

    Diesel service sheets and emissions documentation became part of every contracted maintenance folder.

  4. 2015

    22nd regional parts hub opened

    Remote fleets gained practical access to hoist rope, filters, pins, wear pads and certified rebuild kits.

  5. 2022

    In-house lift re-certification team certified

    Engineers began supporting AS 2550 and ASME B30 review packages directly from customer sites.

Worksite match

Crane and Heavy Equipment Coverage by Site Type

Q

Quarry & Aggregate

Lift parts, crusher wear packages and staged maintenance around shutdown windows.

H

Highway & Asphalt

Telehandler, crane and paving fleet service timed around night closures and lane handbacks.

B

Bridge & Precast Lift

Crawler crane load-chart review, lift beams, rigging notes and standby parts kits.

P

Port & Stockyard

Corrosion-resistant rebuild parts and bulk handling support for exposed coastal equipment.

"TerexParts Pro kept our crawler crane inside the rainy-season lift window. The parts kit arrived with the torque records, and the signed load-chart review saved two days of back-and-forth with the site engineer."

Lifting Supervisor · Bridge precast yard, Southeast Asia · 240-segment viaduct contract

12 wkTypical crane package lead time
5 daysAS 2550 re-certification file
98%Critical part traceability rate
< 18hMean-time-to-repair target

Ready to Quote Your Next Crane Service Window?

Send the machine serial number, lift class and site deadline. Our parts desk maps availability, compliance records and field crew timing before you commit the crane to the schedule.